New Deck Part 6
Well I was hoping that the sub-contractor for pouring the walks would have started last week, but I guess since it was Masters week here in the Augusta area, they didnt even call. Hopefully, the walks will be done this coming week.
We did spent the week running errands, and buying stuff for the deck and other projects around here. Decided to at least post some pictures of the deck with the new furniture and a fairly full complement of plants (at least for now).
|
Approaching from the driveway. |
|
Entering the deck. |
|
Succulents to the left of the steps. |
|
For dining alfresco. |
|
Headed toward the sun-room. A railing post installed next to the gutter down spout holds water and power, |
|
View toward the sun-room. |
|
Looking out from sun-room door. |
The pollen fronds have finally finished falling from the oaks. Without any cracks between the planking, it is quick work to blow them off the deck. Even the mud tracked on the deck during installing the water and power, came off with just a spray of cleanser, brushing with a long handled brush and rinsing with the hose. A lot easier than wood or composites in my experience.
Well have less of a problem with tracking once the walks are installed. Of course, once all this work is finished and vehicles wont be in the backyard, we can finally get something done with the backyard so we wont have so much mud.
Part 7
No comments:
Post a Comment